Site Development

Subdivision Development

Municipal Public Works & CIP

Transportation

Water & Wastewater Systems:

Marina Design & Permitting

Watershed Hydrology &Hydraulics

Water Quality Systems Design

Watershed Water Quality Studies

Woodcreek and Wimberley Springs Lift Station and Wastewater Line, Wimberley, Texas

To meet the wastewater service requirements of multiple educational and commercial properties and subdivisions (3,000 LUE at full build-out), including the proposed Wimberley Springs Subdivision, Loomis Partners designed a lift station and force main along with 1,200 feet of 15” wastewater collection line to serve the entire region. The lift station and wastewater collection system (to be owned and operated by Aqua Texas) was designed to replace three existing undersized force mains.  The lift station includes three pumps operated with variable frequency drives and a maximum flow capacity of 1,900 gpm. Loomis survey staff performed topographic design survey and potholing for location of a complex network of existing utilities.

Services Provided:

  • Cost Estimating
  • Design Survey
  • Lift Station Design
  • Wastewater Utilities Design
Copyright 2012 Loomis Partners, Inc.         Austin, TX: 512.327.1180  |  Bastrop, TX: 512.321.6400  |  San Marcos, TX: 512.396.2600