Wimberley Springs Phase 1 Water Quality and Detention Pond, Wimberley, Texas

Loomis Partners was the design engineer for the Wimberley Springs Phase 1 Regional Water Quality & Detention Pond.  This pond was designed under the TCEQ Edwards Aquifer Contributing Zone rules and provides water quality and detention to an approximately 104-acre basin that includes several sections of future residential development and several golf holes.  A wet pond was selected as the most appropriate BMP for this area because of the size of the contributing watershed and the anticipated nutrient loadings from golf course operations (irrigated by treated effluent).  This pond's permanent pool is roughly 4 acre-feet and provides a water quality volume of approximately 1.6 acre-feet.  Detention volume of approximately 24 acre-feet is provided above the water quality pool for the 100-year storm event.

Services Provided:

  • Bid Phase Services

  • Construction Plans Development

  • Construction Staking

  • Cost Estimating

  • Detention Facility Design

  • Drainage Study & Design

 

 
  • Landscape Planning

  • Presentations at County Commissioners Court

  • SWPPP

  • TCEQ Edwards Aquifer Permitting

  • Water Quality Facility Design