Site Development

Subdivision Development:

Municipal Public Works & CIP

Transportation

Water & Wastewater Systems


Marina Design & Permitting

Watershed Hydrology &Hydraulics

Water Quality Systems Design

Watershed Water Quality Studies
 

Wimberley Springs, Wimberley, Texas

Loomis Partners is the engineer for redevelopment of the Woodcreek North Subdivision, a partially completed subdivision platted in the 1970’s consisting of approximately 3,600 single family lots and a golf course. The property is being re-developed as Wimberley Springs. Loomis staff prepared a comprehensive preliminary engineering report analyzing the design and infrastructure issues associated with the redevelopment and represented the Owner in negotiations with Hays County for a development agreement. Loomis prepared a preliminary plan and final plat of Wimberley Springs Section 1, as well construction plans for Wimberley Springs Phase One. This included a rehabilitation of 2,500 feet of streets, construction of 2,300 feet of new collector roadway, over one mile of new water transmission line, a deceleration lane on FM 2325 and a regional water quality/detention pond.

  Services Provided:
  • Bid & Construction Phase Svcs.
  • Boundary & Land Title Survey
  • City Council Presentations
  • Construction Staking
  • Cost Estimating
  • Design Survey (Tree & Topo)
  • Drainage Study & Design
  • Final Platting
  • Flood Detention Design
  • Floodplain Hydrology/Hydraulics
  • Offsite Utilities Assessment & Design
  • Pre-Con Meetings/Punch Lists
  • Preliminary Plan Development
  • Site Grading Plan
  • SWPPP
  • Utilities Coordination
  • Variance Processing/ Development Agreement
  • Wastewater Collection System Design
  • Water Distribution System Design
  • Water Quality Facility Design

 

 

Copyright 2012 Loomis Partners, Inc.         Austin, TX: 512.327.1180  |  Bastrop, TX: 512.321.6400  |  San Marcos, TX: 512.396.2600