Site Development:

Subdivision Development

Municipal Public Works & CIP

Transportation

Water & Wastewater Systems


Marina Design & Permitting

Watershed Hydrology &Hydraulics

Water Quality Systems Design

Watershed Water Quality Studies
 

Comal ISD Elementary School, Bul Verde, Texas

Under contract to the Comal County Independent School District Loomis Partners performed site design and permitting for a new 800-student elementary school in Bulverde, Texas at the Johnson Ranch development. This 16-acre site, located in the Edwards Aquifer recharge zone, required permitting through TCEQ and the City of Bulverde. Loomis staff coordinated closely with the architect and performed site design including grading, drainage and water quality along with utilities coordination.

Services Provided:

  • Bid & Construction Phase Services
  • Boundary Survey
  • Cost Estimating
  • Design Survey (Tree & Topo)
  • Drainage Study & Design
  • Final Platting
  • Flood Detention Design
  • Offsite Utilities Assessment/Design
 
  • Parking Design
  • Site Grading Plan
  • TCEQ Wastewater Permitting
  • SWPPP
  • Wastewater Collection System Design
  • Water Distribution System Design
  • Water Pollution Abatement Plan
  • Water Quality Facility Design

Copyright 2012 Loomis Partners, Inc.         Austin, TX: 512.327.1180  |  Bastrop, TX: 512.321.6400  |  San Marcos, TX: 512.396.2600