Site
Development
Subdivision
Development
Municipal
Public Works & CIP:
Transportation
Water
& Wastewater Systems
Marina
Design & Permitting
Watershed
Hydrology &Hydraulics
Water
Quality Systems Design
Watershed Water Quality Studies |
Avery
Ranch Wastewater Interceptor,
Austin, Texas
Loomis Partners designed and permitted 3 miles of 15” and 18”
wastewater interceptor to serve the award-winning master planned
Avery Ranch community located on Parmer Lane in Austin, Texas. The
line is owned and operated by the LCRA and feeds into a 48” regional
interceptor draining to LCRA’s Brushy Creek Wastewater Treatment
Plant. Engineering services included Edwards Aquifer permitting
through TCEQ and design of 2 creek crossings with construction plans
review and approvals from the City of Austin.
Services Provided:
-
Bid Phase Services
-
Construction Plans Development
-
Construction Phase Services
-
Cost Estimating
-
Preliminary Engineering
|
-
TCEQ Sewage Collection System Reporting
-
Utilities Coordination
-
Wastewater Interceptor Design
-
Wastewater System Planning
|
 |